Proposed 2017 Capital Projects

e-mail icon

Project

Mountain View Dr/Bragaw St Surface Rehab - Taylor St to Glenn Hwy

Community Council

Sponsor Agency

Project Management and Engineering

Estimated Cost

$2,000,000

Funds on hand

$0

Additional funds required

$2,000,000

Project scope

This project will overlay, reclaim, or rotomill the road surface, evaluate the storm drains and repair or replace as needed, and bring pedestrian facilities into ADA compliance.

Project need

The surface of the roadway rated Conditions E and F in the 2014 GASB survey. This has been visually verified as evidenced by the formation of ruts and pot holes.

Project status

This project has not started. Local road bonds are proposed for design and construction.

Project Comments

Log in or register to post comments

Mountain View Drive from Taylor Street to the Glenn Highway is in excellent condition, with good pedestrian amenities and lighting. This section is not in need of inclusion on this list, and should be removed until such time as this road section is re-evaluated. The Bragaw Street section from Mountain View Drive to the Glenn Highway is constantly being repaired for potholes and wear. That section is in need or more significant repair, and would be a priority for the community as a stand-alone project.