Proposed 2017 Capital Projects

e-mail icon

Project

Hillcrest Dr Sidewalk - West High Campus to Forest Park Dr

Community Council

Sponsor Agency

Project Management and Engineering

Estimated Cost

$750,000

Funds on hand

$0

Additional funds required

$750,000

Project scope

This project will install a sidewalk along Hillcrest Dr., either within the existing shoulder (parking lane) or in the right-of-way beyond the existing curb, or partially on both.

Project need

There is no separation between motorized and non-motorized traffic along this route that is frequently used by West/Romig students, Coastal Trail users, and neighborhood residents. Vehicles often cross into the parking lane used by most pedestrians and cyclists. Conditions are preventing students from walking to school, adding to traffic congestion. The project ranks number 144 in the Anchorage Pedestrian Plan.

Project status

The project has not started. The project will remain on the needs list for future funding consideration.

Project Comments

Log in or register to post comments

This is Turnagain Community Council's #4-ranked Road & Drainage project and a high priority in our Safe Routes to School project list.